The plan called for six inches of topsoil. We keep finding clay.

On several streets in Mueller, the grass between the sidewalk and the curb is thin, bare or dead. Where the ground is open, the sod and the drip line sit right on clay. We're neighbors asking the City to come and inspect it.

Email the City before December 3

A landscape strip between a sidewalk and a curb, with bare soil and dead grass around a mulched tree ring.
Schutze St, November 20, 2026
December 3: the City Council is scheduled to vote on closing Mueller's tax increment zone. Staff say the infrastructure is finished.Email the City first
  • –petition signatures
  • –reports on the map
  • –reports from homeowners
  • –blocks or areas with a report

Seen this on your block? Put it on the map.

The more blocks on the map, the harder this is to ignore. It takes about two minutes on your phone.

  1. Take a photoBare ground, clay showing, or drip line you can see.
  2. Tell us whereType the address, or tap the spot on the map.
  3. Check what's wrong and sendIrrigation, soil, or something else. Add a comment if you like.

We show the block, never your house number, name or email. A volunteer looks at every report before it goes up.

Open the full map to read the reports and filter by irrigation or soil. The dashed line is the outline of Mueller's homes.

What it looks like

Photos neighbors took from the sidewalk. Swipe through them, and tap one to see it bigger.

Zach Scott St and the parks were built years earlier, under other City-approved plans that we have not read yet. The photos show grass that is gone. They don't show why. On Zach Scott St, shade and roots from the street trees may be part of it. A soil and irrigation survey would tell.

What the plan says

The City approved a construction plan for Mueller Section 11 (plan No. C8-04-0043.10.1B.SH). Two notes on Sheet 003 cover the ground under the grass.

Excerpt from Sheet 003 of the approved plan. Note 9A reads: All disturbed areas to be revegetated are required to place a minimum of six inches of topsoil, see Standard Specification Item No. 601S.3(A).
Six inches of topsoil. “A minimum of six (6) inches of topsoil” in all disturbed areas to be revegetated, under City Standard Specification 601S.Sheet 003, Note 9A
Excerpt from Sheet 003 of the approved plan. Note D sets the standard for grass cover: 95 percent coverage with no bare spots larger than 10 square feet.
Grass on 95 percent of the ground. Uniformly vegetated, with no bare spots larger than 10 square feet.Sheet 003, Note D

What the photos show

Where the ground is open, the sod and the drip line sit right on gray and tan clay. No dark topsoil layer shows in the photos. The strips on several streets have bare and dead patches, photographed in June and November 2026. We have not measured them yet.

6 in. of topsoil Drip line, 4 to 6 in. down Clay subsoil
What the plan and the maker call for. Six inches of topsoil for the roots, and the drip line buried where a mower can't reach it.
A loop sticking up Drip line on top of the ground Thin sod right on clay Clay
What the photos show. Sod and line on clay, with the line where a mower can catch it. On one block of Margarita St, lawn equipment tore off a line that stood above the soil. The photos show the surface. They are not a soil survey.

The drip line has rules of its own

The plan covers the topsoil and the grass. The irrigation falls under the City's plumbing code and the state's irrigation rules. Here is how they connect.

  1. The City's plumbing code points to the state rules

    “Irrigation for landscape must comply with the requirements in Chapter 344, Title 30 of the Texas Administrative Code; Sections 614.1 through 614.2 of this code; and requirements imposed by the Texas Commission on Environmental Quality.”City of Austin Ordinance No. 20210603-057, Section 614.0. This was the plumbing code in effect when the Section 11 irrigation permits were issued.
    Image of Section 614.0 as printed in the ordinance.
  2. The state rule says to follow the maker's depth

    “Piping in all irrigation systems must be installed according to the manufacturer's published specifications for depth coverage of piping.”30 Texas Administrative Code §344.62(l)
  3. The maker says 4 to 6 inches down

    “XF Series Dripline is to be installed at a depth of 4"-6" (10.2-15.24 cm) in subsurface and groundcover applications. Use only XFS or XFS-CV dripline in subsurface applications.”Rain Bird, XF Series Dripline Design, Installation and Maintenance Guide
    Close-up of brown drip line stamped XFD 0.9GPH 12 inch.

    The type of line varies from block to block. On the 3100 block of Sorin St the stamp reads XFD, an on-surface line that Rain Bird does not list for grass. The two types it does list for grass, XFS and XFS-CV, go 4 to 6 inches under the surface.

  4. The photos show line at the surface

    On several blocks, and along the street edge of John Gaines Park, the drip line is lying on top of the ground or right under the sod mat.

  5. So it needs an inspection

    From the photos, these lines do not appear to meet the state rule or the City code. Whether that is a violation is for the City's inspectors or the Texas Commission on Environmental Quality to decide. That's the inspection we're asking for.

  6. Most of the permits never got a final inspection

    “A plumbing permit must be obtained before installing a landscape irrigation or yard sprinkler system.”Ordinance No. 20210603-057, Section 104.1.4

    The City issued 15 permits for common-area irrigation in Section 11. Thirteen expired without a final inspection and two were finaled, according to City permit records checked on November 15, 2026.

Email the City before December 3

City staff have asked the Council to close the Mueller Tax Increment Reinvestment Zone that day and to send about $58 million of its balance to housing and homelessness programs and a reserve. Staff's reason is that the major infrastructure at Mueller is complete and paid for. The City's agreement with the developer ends on December 31, 2027.

Street landscaping is part of that infrastructure. If it doesn't match the approved plan, the time to ask for an inspection is before the zone is closed. The staff memo of November 9, 2026 names Mandy DeMayo and Belinda Weaver at Austin Financial Services as the people to contact.

A short email from you helps. Change anything you like, add your name and street at the bottom, and send it from your own email.

Open in my email app
  • To: Mandy.DeMayo@austintexas.gov
  • Cc: Belinda.Weaver@austintexas.gov and poapresident@lifeatmueller.com, the Mueller POA President, so the Association sees what neighbors are sending.
  • Council agendas can change, so check the City's posted agenda before relying on the date.

What the soil is like

One sample from the 3100 block of Schutze St, taken October 6, 2026, and what a home test kit read. Swipe through.

This is a home screening test on one sample, with the colors read by eye. A laboratory test would settle it.

Why would the soil read this way?

Topsoil is dark and crumbly because it holds decayed plant material. Soil stores nearly all of its nitrogen in that material, so ground with very little of it has little nitrogen to give.

The fizz in vinegar is acid reacting with lime. Lime keeps soil alkaline, and in alkaline, limy soil phosphorus binds with calcium into a form roots can't take up. The nutrient can be in the ground and still be out of reach.

Dense clay also has few air spaces. It swells shut when wet and sets hard when dry, so roots stay shallow, up in the sod layer, where they dry out quickly.

Who is responsible?

Here is what the documents say. It's part of what we're asking the City to sort out.

The developer

Catellus Austin, LLC is the developer named on the approved plan. Its Master Development Agreement with the City lists street landscaping as infrastructure it builds, and Section 7.2(g) requires it to have its contractors correct defects and deficiencies.

The home builders

The recorded covenant (Section 2.18) put front-yard landscaping and an automatic irrigation system on each lot's owner before the certificate of occupancy. Before a home was sold, that owner was its builder.

The Association

For the row-house blocks it covers, the covenant gives the Mueller property owners' association “all aspects” of maintaining the landscaping and irrigation from the front of each home to the curb, including the strip along the street. Owners' assessments pay for that upkeep.

The City

The City approved the plan and issued the permits. We are asking it to inspect the work against the plan before the zone is closed.

What we're sure of, and what we're not

  • We describe what the photos show and what public records say. We are asking for an inspection, not announcing a conclusion.
  • The photos show the surface. They are not a soil survey, and the bare areas have not been measured.
  • Not every street or yard has the problem. The map shows only what has been reported and reviewed.
  • The plan and the permits quoted here are for Mueller Section 11. Older streets and the parks were built under other plans, which we have not read yet. Reports from anywhere in Mueller are welcome.